Friday, November 06, 2009

OVER DUE TO POWER SUPPLY PROBLEM

THE SEWAGE MANHOLE IN DR.KOLBE AVENUEIN MEERHOF, WHICH OVERFLOWED FOR APPROXIMATELY TWO DAYS, HAS STOPPED AND THECAUSE OF THE OVERFLOW HAS BEENDESCRIBED AS A POWER SUPPLEY PROBLEM. MR PATRICK MORATHI, SPOKESPEERSON FOR THE LOCAL MUNICIPALITY OF MADIBENG, SAD THAT ELECTRICIAN WERE SENT TO FIX THE PROBLEM AND A POLTUTION OFFICER WILL ASSESS THE POSSIBLE PROBLEM CAUSED BY THE SEWAGE SPILL.