THE SEWAGE MANHOLE IN DR.KOLBE AVENUEIN MEERHOF, WHICH OVERFLOWED FOR APPROXIMATELY TWO DAYS, HAS STOPPED AND THECAUSE OF THE OVERFLOW HAS BEENDESCRIBED AS A POWER SUPPLEY PROBLEM. MR PATRICK MORATHI, SPOKESPEERSON FOR THE LOCAL MUNICIPALITY OF MADIBENG, SAD THAT ELECTRICIAN WERE SENT TO FIX THE PROBLEM AND A POLTUTION OFFICER WILL ASSESS THE POSSIBLE PROBLEM CAUSED BY THE SEWAGE SPILL.